RAFCIOBUD / FINISHING & RENOVATIONS

Solid work.
Visible results.

Your space. Our craftsmanship.
From the first conversation to the final detail.

Let’s talk about your renovation
01 — 03INTERIORS WITH CHARACTER
Roofing · work in progress
Roofing · work in progress
PRECISION IN EVERY DETAIL
TURNKEY INTERIOR FINISHING✳BUILDING WORK✳RAFCIOBUD

01 / OUR SERVICES

Your plans.
Our craftsmanship.

Finishing a new space or refreshing your current one?
Let’s discuss what you need.

01

Turnkey interiors

A coordinated finish for your flat or house, from preparation to the finishing touches.

Discuss your project
03

Building work

Need other building work? Tell us about your plans so we can discuss what is possible.

Ask about the scope

OUR PROJECTS, STEP BY STEP

Work that
transforms spaces.

See the progress from work in progress to installed floor tiles and roofing. Switch between photos or play a short transition.

01

A floor with character

From laying tiles with a levelling system to the finished tiled surface.

Laying patchwork tiles with levelling clips
Work in progress
Patchwork floor after the tiles have been laid
After installation

Different views of the project · select a photo to enlarge it.

02

New roof covering

Preparing the timber battens and installing profiled metal roofing sheets.

Timber roof battens during preparation for the new covering
Work in progress
Roof with profiled metal sheets installed; detail work is still in progress
After installation

Different views of the project · select a photo to enlarge it.

DETAILS & THE BIGGER PICTURE

Every stage has its details.

Patchwork tiles — a close-up of the pattern and joints.
Patchwork tiles — a close-up of the pattern and joints.
House roof — covering being installed, with battens and membrane visible.
House roof — covering being installed, with battens and membrane visible.
Installed roof covering — a front view of the house under construction.
Installed roof covering — a front view of the house under construction.
Detail of a ventilation outlet through the metal roof covering.
Detail of a ventilation outlet through the metal roof covering.

02 / PROJECT PHOTOS

Results and stages
of our work.

Interiors, façades and roofs. Explore the craftsmanship and the progress of the work. Select a photo to see the full image.

01

Bathroom

Strip-out and interior finishing with light tiles and wood-toned accents.

Walls after the old tiles have been removed, before preparation for the new finish.

Removing the old tiles

Walls after the old tiles have been removed, before preparation for the new finish.

Light wall tiles, wood-effect flooring and fittings in a compact bathroom.

Bright bathroom with a shower

Light wall tiles, wood-effect flooring and fittings in a compact bathroom.

02

Tiling

A patterned floor in progress — from planning the layout to levelling the surface.

Laying decorative tiles using levelling clips. Photo taken during installation.

Patchwork tiled floor

Laying decorative tiles using levelling clips. Photo taken during installation.

03

Stairs & interior details

Wood-toned treads paired with light risers and a dark vertical balustrade.

Protected stair treads, light risers and a balustrade with vertical profiles during finishing work.

Stairs during finishing work

Protected stair treads, light risers and a balustrade with vertical profiles during finishing work.

Close-up of stair edges, risers and the underside during finishing work.

Staircase detail

Close-up of stair edges, risers and the underside during finishing work.

04

Façade & plinth

Wall surfaces, window reveals and the base of the façade at successive stages of finishing.

Wall surface and garage door surround during façade work.

Façade around the garage

Wall surface and garage door surround during façade work.

Light textured façade and dark windowsills; the plinth area before the final finish.

Finishing around windows

Light textured façade and dark windowsills; the plinth area before the final finish.

The base of the wall before the final coating is applied to the plinth.

Plinth area in progress

The base of the wall before the final coating is applied to the plinth.

Light façade, windowsills and corner, with the plinth still unfinished.

Façade corner and profile

Light façade, windowsills and corner, with the plinth still unfinished.

Dark plinth finish against a light façade. Work around the building is still in progress.

Graphite-coloured plinth

Dark plinth finish against a light façade. Work around the building is still in progress.

05

Roofing

Installing a dark covering on a roof with skylights — photos of the work in progress.

Partially installed dark roof covering, with battens and membrane visible on the remaining area.

Installing the roof covering

Partially installed dark roof covering, with battens and membrane visible on the remaining area.

Roofing work around the skylights.

Roof slope with skylights

Roofing work around the skylights.

03 / EVERY PROJECT STARTS WITH A PLAN

From our first conversation
to the final detail.

Every space is different.
Let’s start by getting to know yours.

  1. 01

    Let’s talk

    Tell us what you would like to change and the result you have in mind.

  2. 02

    Agree on the details

    We’ll discuss the scope, materials and possible timing.

  3. 03

    Time to get to work

    Work begins with a plan we have agreed on together.

04 / LET’S START WITH A CONVERSATION

Have a space in mind?
Let’s take the first step.

Rafał Ambroziewicz · RAFCIOBUD

GET IN TOUCH

Tell us
about your plans.

What would you like to renovate? Include the type of work, location and preferred timing to help us discuss the details.

Prefer to call? +48 536 184 922 ↗
Additional contact: +48 880 843 533 ↗
Between 10 and 1,200 characters.

This button opens your email app with a prepared message to ambroziewiczrafal91@gmail.com. Send it from that app. Filling in this form alone does not send any data.

RAFCIOBUD ON YOUR PHONE

Always within reach.

Add the app to your home screen. Access our projects and contact details with a single tap.

How do I add the app to my phone?

Android: open this page in Chrome. In the browser menu, choose “Add to Home screen” or “Install app”, if available.

iPhone: open this page in Safari, choose “Share”, then “Add to Home Screen”.

After the first visit, the basic page and contact details are also available offline. Photos require a connection. The form prepares a message in your email app.

Website concept · RAFCIOBUD · Photos show completed elements and work in progress.